1 | Analysis Type: Specify the tool format for this analysis. This selection is not enabled since there is only one format available. |
2 | Num Tasks: Specify the number of rows of data you would like to enter on the worksheet. This information is used to format the worksheet. Note that any data below this formatted area will be cleared. |
3 | View Example: Click on this button to open the example file. You can view the example to get an idea of how to fill out this tool, or you can use the example as a starting point and modify it to meet your project needs. |
4 | Help Button: Click on this button to open the help file on this topic. |
5 | Cancel Button: Click on this button to exit without saving any changes. |
6 | Create Design: If this is your first time using this template, click this button to format the worksheet template. You can also update the worksheet format any time, but remember that you may lose any data entered on this worksheet. Once you are happy with the worksheet template layout, you must enter any required data on the worksheet. When the data entered into the worksheet is complete, you can click on Analysis Setup and then Compute Outputs to generate analysis results. |
7 | Analyze Design: Click on this button to save all changes and compute the outputs for this analysis. Review the results of your analysis and make changes to your inputs if required to update analysis results. |
On the worksheet, you must enter the True North statements finalized by the team. The worksheet is broken up into common sections used for these statements, such as:
| Num | Description |
|---|---|
| 1 | Safety & People |
| 2 | Delivery |
| 3 | Quality |
| 4 | Financials |
The checklist contains a few pointers on things you must pay particular attention to while performing this analysis. The checklist has been derived from experience working on past projects. Not all the checklist items need to apply to you. However, you should carefully review the checklist and apply any recommendations that make sense for your project. Make sure to read each checklist item and mark it as completed after you have read and taken actions as appropriate for your project.
1 | Item: The items on the checklist are listed on the left |
2 | Status: The status of whether the checklist has been answered is listed on the right. |
The software checks if you have correctly specified the input options and entered the required data on the worksheet. The results of the analysis checks are listed on the right. If the checks are passed, they are shown as green checkmarks. If the verification checks fail, they are shown as a red cross. If the verification checks result in a warning, they are shown in the orange exclamation mark, and finally, any checks that are required to be performed by the user are shown as blue info icons.
1 | Item: The left-hand side shows the major tabs and the items checked within each section |
2 | Status: The right-hand side shows the status of the checks. |
3 | Overall Status: Shows the overall status of all the checks performed. If all the checked items are okay, the status image in the header will show a green checkmark. If any checks fail, then the status image in the header will show a red cross mark. |